Pure technical operation and maintenance service plan
APP query: Analyze power station data, real-time inspection of equipment failures, data anomalies, and other situations.
Project | Inspection Content | Inspection Frequency | |
APP Query | Analyze the power station data, and check for equipment failures and data anomalies in real time. | Half a day/time | |
Safety and operation inspection of the power station | Grid connection cabinet area | Metering system: The energy meter displays normally, no alarms, energy data is correct, and the error is within the specified range. | Once a month (the above is the fixed inspection frequency; if a fault occurs on site, a safety and operation inspection of the power station will be conducted while handling the fault.) |
|
| Current transformers: Check for abnormalities in voltage and current transformers, and whether connections are secure. |
|
|
| Switch position indication matches switch status, energy storage mechanism status is correct. |
|
|
| When closed in operating position, high voltage live display three-phase indicator lights are on. |
|
|
| Bus voltage meter displays consistent with rated voltage; no discharge sound inside the switch cabinet; no odor or other abnormal sounds. |
|
|
| Isolation knife switch's static and dynamic contacts are in good contact without overheating. |
|
|
| Isolation knife switch operating mechanism is intact. |
|
|
| Switch open/close position indication is correct; switch has no abnormal sound or odor. |
|
|
| The equipment body has no hanging objects; there are no abnormal sounds inside the circuit breaker body. |
|
|
| Cable joint insulation shows no aging or damage. |
|
| Inverter | (KW) Current Load |
|
|
| (A) DC Side Current |
|
|
| (℃) Inverter Temperature |
|
|
| (Status of each indicator light) |
|
|
| (Status of each operating parameter) |
|
|
| (Fault situation) |
|
|
| (Inverter operating condition) |
|
|
| (Check for deformation of inverter casing) |
|
| (Module) | (Check if photovoltaic panels are clean) |
|
|
| Photovoltaic panels have no breakage |
|
|
| Photovoltaic panels have no deformation |
|
|
| Check if brackets are deformed |
|
|
| Check if junction boxes show heating or deformation |
|
|
| Typhoon pre- and post-inspection |
|
|
| 'According to actual conditions' |
|
|
| 'Conduct comprehensive analysis of the power station during operation cycle and propose reasonable optimization suggestions' |
|
|
| 'Module cleaning' |
|
'Four times a year' | 'Conduct deep maintenance on the overall power station' | 'Use professional instruments to conduct hot spot detection on all modules' | |
'Handle recovery on-site after faults occur' | 'Electric meter data' | 'Once a month' | |
Component cleaning | Use manual and electric tools for cleaning (arrange cleaning according to the actual power generation efficiency) | 4 times/year | |
Annual maintenance | Conduct in-depth maintenance on the entire power station | 'Once a month' | |
Hot spot detection | Use professional instruments to perform hot spot detection on all components |
| |
Fault handling | After a malfunction occurs, go to the site to handle and restore it | real time | |
Electricity meter data | Electric meter reading | Once a month |